List of references
Total records:  451 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2016  United Kingdom  ABB Ltd.
Daresbury Park
Daresbury
Cheshire
WA4 4BT
United Kingdom 

CMS Noss Head Cable landfall ducts installed through strong Caithness Flagstone rocks 

475 

310 

2015  Spain  Client: COPASA S.A., Rua do Paseo No. 25, Entilo, 32.003 Ourense, Spain
Main Contractor: ACUA. ES 

WWTW Outfall Ribeira/Coruna, Spain
HDD in hard granite rock into the sea. Pullback of pipe string from the sea to land. 

450 

660 

2015  Luxembourg  Creos Luxembourg S.A.
59 - 61, rue de Bouillon
L-1248 Luxembourg 

Two crossings of River Alzette
 

785 

650 

2015  Luxembourg  Creos Luxembourg S.A.
59 - 61, rue de Bouillon
L-1248 Luxembourg 

Two crossings of River Alzette
 

785 

650 

2015  Netherlands  N. V. PWN Waterleidingsbedrijf Noord-Holland
Postbus 2113
1990 AC Velserbroek
Netherlands 

Test Drilling for New Pipeline Project Den Helder Texel 

2000 

400 

2015  Netherlands  N. V. PWN Waterleidingsbedrijf Noord-Holland
Postbus 2113
1990 AC Velserbroek
Netherlands 

Test Drilling for New Pipeline Project Den Helder Texel
 

1000 

400 

2015  France  Client: TIGF - Transport et Infrastructures Gaz France, 40 Avenue de l'Europe, 64010 Pau, France
Joint Venture with: SPAC, 13 rue Madame de Sanzillon, 92110 Clichy, France 

Gas Pipeline Deviation DN 350, Ossun - Bernac-Debat, Hautes-Pyrenees, France, Underground intersection in adverse ground conditions, topsoil: 20 m gravel/cobbles 

576 

560 

2015  Spain  Client: ACUA ES, Aguas de las cuencas de Espana SA, Spain
Main Contractor: COMSA, S.A.U., 48001 Bilbao, Spain 

Autovia del Agua, section Cicero - Colindres, crossing of the Ria del Escalante, 3-dimensional curve in strongly karstic limestone with great requirement for cementations to seal formation 

685 

1100 

2014  Germany  Client: Vattenfall Europe Waerme AG, Puschkinallee 52, 12435 Berlin, Germany
Main Contractor: ARGE Dueker Mueggelspree, Scharnweberstrasse 24, 13405 Berlin, Germany 

Steamline (Distance Heating) in Berlin - Koepenick, Crossing of River Mueggelspree in City of Berlin-Koepernick, Concentric district heating Pipeline, steel pipe DN 350 inside steel pipe DN 550, 2 parallel HDD for hot and return water. 

300 

762 

2014  Italy  Client: SARPOM, Via Vigevano 43, 28069 S. Martino di Trecate, Italy
Main Contractor: Guatelli S.p.a., Via Novara 166, Trecate 28069, Italy 

Bormida 2
A river and hill crossing by HDD with a difference of height between the entry and exit point, oil pipeline
Trecate - Quiliano DN 200 (8") 

328 

200 