Search our reference database
Country    
Year from   until Material / Bundle  Steel  PE  Bundle
Length from * [m] to * [m] On-/ offshore   Onshore  Offshore 
Diameter from * [mm] to * [mm] Soil  soft  hard

Clear form

 
*) Recommendation: enter a range of values in these fields for better search results.
List of references
Total records:  451 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2016  Germany  Energienetze Mittelrhein GmbH & Co. KG
Schuetzenstrasse 80 - 82
56068 Koblenz 

Crossing of river Rhine in Pfaffendorf, Koblenz, in rock with 14 m gravely overburden.
 

402 

350 

2016  Germany  Energienetze Mittelrhein GmbH & Co. KG
Schuetzenstrasse 80 - 82
56068 Koblenz 

Crossing of river Rhine in Oberwerth, Koblenz, in rock with 12 m gravely overburden.
 

420 

560 

2016  Germany  Energienetze Mittelrhein GmbH & Co. KG
Schuetzenstrasse 80 - 82
56068 Koblenz 

Crossing of river Rhine in Oberwerth, Koblenz, in rock with 12 m gravely overburden. 

420 

560 

2016  United Kingdom  Land & Marine Engineering Ltd (subsidiary of J. Murphy & Sons Limited)
Hiview House
Highgate Road
London NW5 1TN
United Kingdom 

Outfall drill from within Nuclear Power Station grounds to offshore exit point. Very strong and abrasive rock. 

315 

310 

2016  United Kingdom  Balfour Beatty Utilities Solutions Ltd., West Service Road, Raynesway, Derby, DE21 7BG, United Kingdom 

Drilling through Peterhead Granite for the installation of an Offshore Windfarm Power Cable Duct. 

660 

610 

2016  Bulgaria/Romania  Client: BULGARTRANSGAZ + TRANSGAZ ROMANIA
Main Contractor: HABAU PPS Pipeline Systems S.R.L., Sinaii Street no 3, Etaj 1 + 2, 100357 Ploiesti, Jud. Prahova, Romania 

Natural Gas Pipeline Interconnector Bulgaria - Romania, crossing of River Danube near Russe (BG) in karstic limestone. 

2100 

660 

2016  Bulgaria/Romania  Client: BULGARTRANSGAZ + TRANSGAZ ROMANIA
Main Contractor: HABAU PPS Pipeline Systems S.R.L., Sinaii Street no 3, Etaj 1 + 2, 100357 Ploiesti, Jud. Prahova, Romania 

Natural Gas Pipeline Interconnector Bulgaria - Romania, crossing of River Danube near Russe (BG) in karstic limestone involving underground intersect (meeting in the middle) technique during pilot drilling. 

2100 

660 

2016  United Kingdom  ABB Ltd.
Daresbury Park
Daresbury
Cheshire
WA4 4BT
United Kingdom 

CMS Noss Head Cable landfall ducts installed through strong Caithness Flagstone rocks 

475 

400 

2016  United Kingdom  ABB Ltd.
Daresbury Park
Daresbury
Cheshire
WA4 4BT
United Kingdom 

CMS Noss Head Cable landfall ducts installed through strong Caithness Flagstone rocks
 

475 

400 

2016  United Kingdom  ABB Ltd.
Daresbury Park
Daresbury
Cheshire
WA4 4BT
United Kingdom 

CMS Noss Head Cable landfall ducts installed through strong Caithness Flagstone rocks
 

475 

400 

|< <<   1 2 3 4 5 6 7 8 9 10 of 46  >> >|  

© 2005-2019 LMR Drilling GmbH