List of references
Total records:  451 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2018  Germany  Client: Hallesche Wasser und Stadtwirtschaft GmbH, Bornknechtstrasse 5, 06108 Halle (Saale)
Main Contractor: Brochier Rohrleitungsbau Nuernberg GmbH, Leipziger Platz 19, 90491 Nuernberg 

Drinking water pipe Passendorfer Wiesen, crossing of river Saale in the city of Halle, difficult soil conditions (rock, clay, sand, gravel), casing pipes installed at entry and exit point 

1115 

913 

2018  United Kingdom  Client:
SGN - Scotland Gas Networks
95 Kilbirnie Street
G5 8JD Glasgow, GB
Main Contractor:
J. MURPHY & SONS LTD.
Hiview House
Highgate Road
NW5 1TN London 

ERSKINE BRIDGE GAS PIPELINE REPLACEMENT
Segment B, DN 450 

959 

610 

2018  United Kingdom  Client:
SGN - Scotland Gas Networks
95 Kilbirnie Street
G5 8JD Glasgow, GB
Main Contractor:
J. MURPHY & SONS LTD.
Hiview House
Highgate Road
NW5 1TN London 

ERSKINE BRIDGE GAS PIPELINE REPLACEMENT
Segment A, DN 450 

929 

610 

2018  Germany  Hugo Schneider GmbH
Hafenstr. 140
59067 Hamm 

Bergkamen / Mittelbach
DA 355x21,1 mm SDR 17
 

516 

457 

2017  Netherlands  N.V. PWN Waterleidingbedrijf Noord-Holland
Postbus 2113
1990 AC Velserbroek
Netherlands 

Installation of new waterpipeline for the island of Texel. Europes longest HDD crossing! 

4608 

483 

2017  United Kingdom  NKT Cable Group a/s
Outlon Road, Stone
Staffordshire
ST15 0RS
United Kingdom 

CMS Protgordon Cable landfall ducts installed through moderately strong Old Red Sandstone rocks and 5-20m of sand and gravel overburden
 

1650 

445 

2017  United Kingdom  NKT Cable Group a/s
Outlon Road, Stone
Staffordshire
ST15 0RS
United Kingdom 

CMS Protgordon Cable landfall ducts installed through moderately strong Old Red Sandstone rocks and 5-20m of sand and gravel overburden 

1650 

445 

2017  United Kingdom  NKT Cable Group a/s
Outlon Road, Stone
Staffordshire
ST15 0RS
United Kingdom 

CMS Protgordon Cable landfall ducts installed through moderately strong Old Red Sandstone rocks and 5-20m of sand and gravel overburden 

1650 

445 

2017  United Kingdom  NKT Cable Group a/s
Outlon Road, Stone
Staffordshire
ST15 0RS
United Kingdom 

CMS Protgordon Cable landfall ducts installed through moderately strong Old Red Sandstone rocks and 5-20m of sand and gravel overburden 

1650 

445 

2017  Germany  Client: Hallesche Wasser und Stadtwirtschaft GmbH, Bornknechtstra├če 5, 06108 Halle (Saale)
Main Contractor: Brochier Rohrleitungsbau Nuernberg GmbH, Leipziger Platz 19, 90491 Nuernberg 

Water pipeline to Dow Olefin chemical plant Schkopau, crossing of river Weisse Elster and natural reserve area, steel pipes with concrete lining
 

1700 

560 